Analysis Design Insights For IEEE Transactions On Wireless Communications

Benefits of Using Prototype Development Methodology

Software development can be defined as the proper type of the prototype model which helps in focusing on the factor that the given project is executed before the given deadline. This specific methodology primarily involves the various measures which easily gets involved in various developments which builds up the prototype for the given base. Then the client processes are started. The flow of the processes mainly involves the different types of the prototypes design and the client evaluation along with the reviews. management, it can be said that a proper prototype development helps in the deter development of the project.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper
  • The Various kind of the risks that can take place in the given project can easily be identified.
  • Error can easily be handled with proper review and evaluations.
  • It becomes lot easier for the clients to understand the project using the prototype of the project.
  • The number of the waste generated that reduces the number of the resources available for the project.
  • It has been seen that the various request from the clients distracts the developer from the actual goal of the project.
  • If the client asks for changes in the later stage of the development then it becomes difficult for the developer to go back.
  • The various generated prototypes increases the amount of the development time and the price of the project.

This method is one of the best for the projects of short interval of times, and is one of the most efficient one. The strategy which makes that this process one of the available methodology is because of the factor that it ensures high quality of work in a very short interval of time. The developers also gets very much interested at the complexity of the projects are very much less and hence there are lots of scope to develop the best outcome.

Some of the major benefits of using this methodology is efficiency, time, client feedback and the risks in the methodology can be easily reduced. In cases of any error the amount of the changes that are to be made very less due to small size of the project. The profit amount in this process is very high due to small size of the projects. There are many kinds of benefits which can be obtained like feedback of client which helps in proper maintenance of standard. One of the major drawback of this methodology is the factor that it cannot be used for large projects which has many requirements.

Description: 

This development methodology is a part of agile methodology, which is mainly used of for the software development projects. The D.S.D.M. projects usually includes on RAD approach which mainly used for the different kinds of association provided by client side. The RAD approach is the business development of the project in a short interval of time. Apart from various objectives it also aims in giving programming models which is predefined in the given budget plan.  The different kind of involvements from the user’s side in the given process is generally prominent in nature. The expensive nature of this process from both the user and the developer side leads to very small profit from this procedure.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

DSMD Methodology for Software Development Projects

Description: 

The joint application development methodology primarily focusses on the involvement of various users at a given interval of time for a given project. These workshops are commonly known to be the JAD sessions. It has more customer loyalty due to the factor that it is rated according to the client for given phase of the project. This methodology is primarily developed for the various kind of the frameworks related to the PCs. There are various kind of the users and the developers are connected in the same time and hence there are more scopes of discussion. The stakeholder expectation are much higher in this methodology. There are many of the drawbacks in this methodology and is also a very inefficient way of development.

For proper kind of methodology, it should be taken into account neglected organization is considered to be small one. It is suggested to implement waterfall model as it will help them in increasing the size. On the contrary for large size organization it is generally suggested that they should implement to make use of RAD technology to their given software development. This particular method or process is considered to be efficient and various kinds of development cost of the given cost of project is mainly considered to be easily bearable by the given organization taking account of the size of the given organization.

Re: Adopting a User Centered Design (UCD) approach and setting a plan for the development of the Human Computer Interaction (HCI)

There is various type of difficulties which are faced by the organization in the present time. This has brought about the need for the development of a user centered Design. Hence there is a proposal to develop a solution which is user centric and the developed system would be able to produce an efficient solution that would be perform functions that would be helping the organization in reducing the response time.

The system would bring about efficient solution and make the procedures of the organization automated. The system would also reduce the time required for management of the workload and increase the efficiency of the organization. The major procedures of the organizations are also handled by the system.

Event

Event Type

Trigger

Source

Activity/Use Case

System Response/Output

ABN Record

Internal

The system has enter the ABN number of the customer id

Sales Representative

ABN details Record

Customer details are stored

Filling of application form

External

Entry of customer details

Customer

Application Form

Accepting the submission of form

Application Review

Internal

the form being reviewed by the admin

Management

Application Review

Analyzing the provided application

Customer Details Record

Internal

Entry of customer details into the system

Sales Representative

Customer Details Record

Customers Details are stored

Select order

External

Customer make selection  of order

Customer

Selection of Order

Customer select the items

Online Orders placing

External

Place the orders selected

Customer

Product Order Online

Items Placed into the Customer’s account

Review Order before Placing

External

Customer reviews the order

Customer Review order

Producing the items details to the customers

Order Confirmation

Internal

Selecting the order to confirm

System

Confirm Order

Customer order is stored in the system

Review Order after Placing

Internal

Customer placed orders are reviewed

Management

Management  Review order

Producing the items details to the management

Check Order Progress

Internal

tacking the progress of the order

Customer

Track Orders

Order Progress being displayed by the system

Order Delivery

Internal

Delivery of the product

Delivery Staff

Deliver Order

System stored the delivery order

Maintain the record

External

Maintaining the record of the report

Management

Maintain the Record

System stored the record

Identify Customer

Internal

Viewing the actions of the customer

Management

Identify Customer

Stored the visit of the customers in the system

Track visits of Customer

Internal

tracking of customers’ orders online

Management

Track Customer Visits

Displayed the customer’s order details

Check Sales Report Monthly

Internal

Generating of monthly sales report

System

Monthly Report of Sales are Checked

Displayed monthly sales report

Running the sales report

Internal

Analyzed the sales report

Management

Displayed the sales report analyzed

Displayed the analysis of sales report

Use Case Name:

Application review

Scenario

The application would be reviewed by the management

Triggering Event:

The application would be submitted by the customer.

Brief Description:

The application is reviewed and it is decided if the application is accepted or not.

Actors:

The management, the customers

Related Use Case:

Not applicable

Stakeholders:

The customers

Precondition:

The details of the customer are entered in the application.

Post Condition:

The customer would be registered in the system.

Flow of Activities:

Actor

System

1. The customer would enter the application

2. The application of the customer is accepted/rejected.

1. Send for review

2. Rejected or accepted

Exception Conditions:

The ABN of the customer is absent.

 

References

Alkhateeb, A., Nam, Y.H., Rahman, M.S., Zhang, J. and Heath, R.W., 2017. Initial beam association in millimeter wave cellular systems: Analysis and design insights. IEEE Transactions on Wireless Communications, 16(5), pp.2807-2821.

Azar, A.T. and Vaidyanathan, S. eds., 2015. Chaos modeling and control systems design (Vol. 581). Germany: Accounting.

Dennis, A., Wixom, B.H. and Tegarden, D., 2015. Systems analysis and design: An object-oriented approach with UML. John wiley & sons.

Dong, X., Shi, Z., Lu, G. and Zhong, Y., 2015. Formation?containment analysis and design for high?order linear time?invariant swarm systems. International Journal of Robust and Nonlinear Control, 25(17), pp.3439-3456.

McCuen, R.H., 2016. Hydrologic analysis and design (Vol. 3). Prentice Hall.

Montgomery, D.C., 2017. Design and analysis of experiments. John wiley & sons.

Rashid, M.H. ed., 2017. Power electronics handbook. Butterworth-Heinemann.