Construction Waste And Pollution In Australia

Sources of Waste and Pollution

Discuss about the Critical Review of Research on Management.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

The construction industry in Australia has been developing at a rapid speed.  In several parts of the country, most if the buildings are old.  The average age of the buildings is 28 years.  Therefore, the country has been focusing in reconstructing these buildings to secure safety and privacy of the citizens in the country. Therefore, due to heavy construction work in the country, production of waste material has been increasing. The waste water management in the country have been helpful in maintaining the waste material in the industry. The sources of waste are mainly of three types including municipal solid waste (MSW) from household, commercial and industrial waste (C&I) and construction and demolition waste (C&D) (Zhan et al. 2018). These waste sources are responsible for ejecting enormous amount of waste in the country.  Wastes are the byproducts that creates pollution in the cuties and countries. These wastes need to be maintained and recycled properly to minimize the pollution rate in the country.  However, Australia has been suffering with the problems of the pollution including land, air, water and noise.  The rate of the pollution has been increased by 11% from last few years.  These has been an alarming situation for the government of the country to control the pollution.  However, pollution can be controlled by the waste management in the country.  Construction sites are responsible for ejecting huge amount of construction waste in the country.  There has been huge amount of construction going in the country as most if the buildings are average 28 years old.  Therefore, the construction waste management has been a important topic for the researchers in the country.

In the advanced circumstances, the reception of constructional management rehearses are being used which is the fundamental explanation behind the expansion in constructional division around the globe. In a comparable way, the utilization of advancements for the constructional angles alongside the utilization of other related devices and systems have additionally been changed because of it. In any case, the utilization of different instruments and methods has expanded the multifaceted nature in the framework (Hardin and McCool 2015). The event of mishaps because of the appropriation of such methods and devices are the fundamental purpose behind the use of security management hones in development segments.

As indicated by the waste management arrangements, there are 14 components which must be considered in considering and staying with it. The principal component is the worker investment which guarantees that every one of the representatives including the generation and the upkeep staff must be available if there should arise an occurrence of any vital commands. Construction is an impotant industry sectoer in the Australia. Construction companies has been providing 14 percent of the total revenue of the country. Therefore, due to the huge demand in the construction industry, massive buildings and complexes are structured in the country. This has been causing a huge amount of construction waste material in te country. Building and construction qwastre have been identified in the survey of 2012 by the government of Australia.  This has been causing serious issues in the country. However, there are a few difficulties to business improvement through waste catch and reusing in the Capital Region. Right off the bat, there is the presence of varying administration game plans with two levels of government (State/Territory and nearby government) and 13 part Councils making up the neighborhood government gathering (SEROC) (Bega Valley Shire Council, Bombala Shire Council, Boorowa Shire Council, Cooma-Monaro Shire Council, Eurobodalla Shire Council, Goulburn Mulwaree, Harden Shire Council, Palerang Council, Queanbeyan City Council, Snowy River Shire Council, Upper Lachlan Shire Council, Yass Valley Council and Young Shire Council) all arranged inside the State of New South Wales and identified with the Australian Capital Territory with its different administration game plans. Besides, contrasted with the ACT, the local neighborhood government zones encompassing the capital need scale because of low populace thickness and little scale financial improvement movement.The activity in the region has been creating a lot of posssibgilities for the pollution in the countryside areas (Mäki and Kerosuo 2015). The following component included is change management which is essentially set up for embracing changes to the framework. The eleventh and twelfth component includes occurrence examination and crisis arranging which is worried about exploring episodes and arranging reactions for the framework. The thirteenth component engaged with this procedure is the prerequisite for consistence based reviews. This must be trailed by the workers so an accreditation is dependably in procedure to indicate the structure.

Waste Management Practices

The development business is all around among the fundamental purchasers of vitality and assets. Inordinate utilization of regular assets and a lot of C&D squander are an aftereffect of an absence of attention to asset proficient development hones (UNEP, 2002). The techniques for Reduce, Reuse, and Recycle (3Rs) are generally connected for city squander administration however less honed in the development business. One reason is that reusing building materials is not popular. There is an absence of market interest for a few kinds of development waste, for example, concrete and broken blocks. Past research on C&D squander has predominantly centered around the sorts of squanders, administration procedures, and advances. The institutional advancement (e.g. readiness to change dispositions and conduct relating to squander age, accumulation, and transfer) has been less investigated. This include of event of mishaps the development destinations of Australia has been hoisted regardless of the way that the development business has rolled out numerous productive improvements. Despite the fact that the business status of the development business can be named near 8%, its responsibility to mischances covers 0ne-third of the aggregate number of mishaps in the past numerous years (Zhan et al. 2018). For the numerous number of mischances in the mechanical segments, its main part is because of the nearness of development industry.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Since the previous decades, the use of waste management techniques in the development enterprises by the legislature included upholding the security statutes. The development businesses should tail them and address any challenges forced. The related work division of the management should send security reviewers to the site for doing effective examination and checks (Hong et al. 2015). This sort of estimation principles was viable and tended to every one of the conceivable outcomes of mistakes which thusly prompted the modern heads to address their worries. Investigation was not being done in the way required and this thusly prompted carelessness in wellbeing management receptions.

The idea of development management uses the principle strategies of dealing with an undertaking from the begin to the wrap up. Obstructions and risks, (for example, cost, time, quality, adequacy, and motivator), were first recognized from an audit of the writing, at that point center gathering workshops were sorted out to approve the discoveries from this writing survey. A work area ponder was done to distinguish and group segments of expenses took after by meetings to affirm costing information. The sole appropriation of this idea is essentially used in the constructional business (Mäki and Kerosuo 2015). As remarked by Li et al. (2015), there is much risk associated with any sort of development based exercises particularly the ones which include performing errands on statures. As cleared up by Sousa, Almeida and Dias (2014), these conditions incorporate dangerous social issues and hazardous conditions which can prompt the nearness of different issues. The examination exhibited in this paper will be pointed towards the improvement of the wellbeing construct exercises with respect to the constructional activities to such an extent that they can be appropriately relieved.

Challenges to Waste Management

The use of development management ideas incorporates arranging, planning and controlling the task advance from the earliest starting point to the finish of the undertaking. As remarked by Zhou, Goh and Li (2015), the usage of development management is chiefly gone for review the necessities of the customers required for the creation of a fiscally proficient task scope.

The initial step required here is investigating the market requests of the venture. This will helps in characterizing the extension and destinations of the task. The subsequent stage included is reasonable arranging which helps in social event a preparatory outline of the task. The third step included is outline and designing frameworks which determines the development based plans. As clarified by Chan et al. (2014), the fourth step included is the obtainments and development based exercises. This is joined by the finishing of the development stage. The fifth step associated with the development management design is increment in the inhabitance rate. These outcomes in the offices and the workers dependable to use the managements made. The following stage included is appropriation of tasks and upkeep segments in the venture. As remarked by Ju and Rowlinson (2014), this encourages in tending to the viable existence of the undertaking and furthermore causes it to remain dynamic for quite a while. The last advance included is the transfer of the office which means the end stage. The assets that are required regardless of constructional exercises include distributing and overseeing them. This aides in using the required assets with the end goal that the dangers and dangers associated with the region are expelled. This additionally helps in giving a general thought of the necessities of the site. Subsequently, the need to deal with the assets close by is likewise a pre-essential which is associated with this case. The asset management forms includes utilizing arranging and planning the parameters included. In the event of arranging stage, the different parameters are examined and evaluated before the beginning of the undertaking.

The outline organize associated with instance of a development venture comprises of different advances. These incorporate practicality and programming, schematic plan ideas, improvement of the outline and authoritative records. The faculty in charge of these constructional configuration stages must see that every last parameter are met and lived with the venture objectives and goals. Also, the codes and controls identified with must be met. The possibility and programming forms includes defining up the objectives and goals with the goal that the general thought of allocating building sizes and room spaces will be considered. For making a constructional venture, the part of a contractual worker is extremely basic who is relegated to the task either by low-offer choice method, best-esteem determination system or the capability based choice procedure As talked about by Li et al. (2015), this is fundamentally done to initiate with the working of the venture. The schematic outline contemplations comprises of different portrayals which will help in recognizing the spaces and examples included. Notwithstanding it, the hues and the material sizes are likewise to be considered. Besides, the outline improvement stage includes exploring and looking into about the different materials that will be utilized and its related expenses. Ultimately, the agreement archives are the last contemplations which will be marked by the two gatherings. This will be considered while selecting the undertaking. The targets indicated in the contracting archive will be taken after while building the task.

Construction Management and Safety

The following stage engaged with the development management of Australia is acquisition stage. In this stage, all the related assets which will be required for an undertaking are to be bought. As proposed by Zhang et al. (2017), in the event that an organization has their own temporary workers, the venture is effectively lauded while if there should be an occurrence of the nonattendance of the general contractual worker, the sub-contract based workers are reached for beginning of the undertaking exercises. As expressed by Li, Fong and Chan (2015), the development stage starts with a pre-development review which is typically initiated with the assistance of higher authorities. In this stage, the different assets to be required and the course of events to be set are talked about. Besides, the financial backing identified with the venture is likewise to be talked about in this stage.

The aim of the research is to analyses the waste management in construction industry in Australia.

The objectives of the research are as follows:

  • To understand the concept of construction waste management
  • To identify the challenges in implementing waste management in construction industry
  • To recommend strategies in order to mitigate these challenges in the construction industry

Following are the research questions:

  • What is the concept of construction waste management?
  • What are the challenges in implementing waste management in construction industry?
  • How these challenges in the construction waste management can be mitigated?

This section of the paper discusses about the various approaches and the concepts that will be used for making an analysis of the concept. This section includes the discussions associated to the case studies. The data to be collected will be analyzed for this paper. In addition to this, an survey is associated for collecting information related to the project. These survey questions are made from the associated literature review of this paper. The structures of the survey questions were developed by considering the objectives of this research. This paper will include studying members with survey. The example respondents of this paper are 3 supervisors of various level. This contains works, chiefs, contractual workers and official level representatives. For gathering the reactions, an overview procedure will be embraced. The overview will help in gathering the data from the respondents which will be utilized as a part of making an examination for this paper. There will be 6 questions which will be studied to the 3 respondents for this paper. This exploration paper incorporates breaking down the information gathered from the contextual investigations. This will include the use of auxiliary information gathering. Optional information gathering includes accumulation of the information from auxiliary sources which are acquired from online diaries, daily papers and sites. As this paper has used data from contextual investigations, auxiliary information accumulation strategy has been executed.

Development of Construction Management Practices

This paper has additionally used the inclusion of research information examination techniques. This is principally engaged with the examination of the data that is gathered. There are two distinct sorts of information examination forms, the subjective and the quantitative information investigation. If there should be an occurrence of the quantitative information investigation, accentuation is given on the amount of information. These are generally done by utilizing overview polls as an investigation apparatus. Then again, if there should be an occurrence of the subjective information investigation, the usage of reviews is embraced for thinking about the nature of information. There are different confinements of this exploration paper. The data from these sources postured issues in gathering them. The accumulation of contextual analyses gave issues amid information gathering. What’s more, absence of spending plan was likewise another explanation behind this paper to confront different constraints. Finally, the overview procedure with the development site authorities included correspondence issues.

Task Name

Duration

Start

Finish

Predecessors

Big data Analytics

93 days

Mon 6/4/18

Wed 10/10/18

 

   Study Initiation

11 days

Mon 6/4/18

Mon 6/18/18

 

      Study Requirements Analysis

2 days

Mon 6/4/18

Tue 6/5/18

 

      Approval of Research Topic from Supervisor

1 day

Wed 6/6/18

Wed 6/6/18

2

      Development of Research Plan Charter / Document

2 days

Thu 6/7/18

Fri 6/8/18

3,2

      Development of Research Framework

4 days

Mon 6/11/18

Thu 6/14/18

4,2

      Prepare Draft Research Proposal

2 days

Fri 6/15/18

Mon 6/18/18

5,4

   Research Planning

21 days

Tue 6/19/18

Tue 7/17/18

 

      Formation of Research Team

2 days

Tue 6/19/18

Wed 6/20/18

6

      Analysis of Research Requirement

1 day

Thu 6/21/18

Thu 6/21/18

6,8

      Identification of Research Questions

4 days

Fri 6/22/18

Wed 6/27/18

8,9

      Identify Scope of Research

4 days

Thu 6/28/18

Tue 7/3/18

10

      Estimate Research Timeline

4 days

Wed 7/4/18

Mon 7/9/18

10,11

      Allocation of Resources and Time for the Research

2 days

Tue 7/10/18

Wed 7/11/18

10,11,12

      Initiation of Research

4 days

Thu 7/12/18

Tue 7/17/18

13

   Research Development

26 days

Wed 7/18/18

Wed 8/22/18

 

      Determination of Research Problems

4 days

Wed 7/18/18

Mon 7/23/18

13,14

      Access to Necessary Media

1 day

Tue 7/24/18

Tue 7/24/18

13,16

      Access to Online Library

1 day

Tue 7/24/18

Tue 7/24/18

13,16

      Selection of Literary Sources

2 days

Wed 7/25/18

Thu 7/26/18

13,17,18

      Literature Review

4 days

Fri 7/27/18

Wed 8/1/18

19

      Collection of Necessary Data

10 days

Thu 8/2/18

Wed 8/15/18

19,20

      Collection of Secondary Data

5 days

Thu 8/16/18

Wed 8/22/18

21

   Data Analysis

8 days

Thu 8/23/18

Mon 9/3/18

 

      Analysis of Primary Data

4 days

Thu 8/23/18

Tue 8/28/18

21,22

      Analysis of Secondary Data

4 days

Wed 8/29/18

Mon 9/3/18

24

   Research Evaluation

13 days

Tue 9/4/18

Thu 9/20/18

 

      Evaluation of Data

6 days

Tue 9/4/18

Tue 9/11/18

21,22,23,24

      Reflection on Research Undertaken

2 days

Wed 9/12/18

Thu 9/13/18

27

      Documentation of Learning Outcomes

2 days

Wed 9/12/18

Thu 9/13/18

27

      Issues Identification and Future Planning

5 days

Fri 9/14/18

Thu 9/20/18

29,28

   Research Closure

14 days

Fri 9/21/18

Wed 10/10/18

 

      Complete All Acitvities in Research

1 day

Fri 9/21/18

Fri 9/21/18

30

      Documentation of Entire Research

10 days

Mon 9/24/18

Fri 10/5/18

32

      Validation of the Research and Learning

2 days

Mon 10/8/18

Tue 10/9/18

33

      Team Sign Off

1 day

Wed 10/10/18

Wed 10/10/18

34

Conclusion

It can be concluded that the waste management has helped in maintaining the construction waste in Australian construction industry. The prerequisite for development organization in the constructional parts of Australia is a genuinely fundamental need. This must be done by extending the consistence of the activities required with advancements with development organization. The utilization of security organization in the constructional parts must be done by all the related accomplices who are at give required the assignment. These consolidates the clients, wander executives who is the lead of the endeavor, the designers who are responsible for the draftsman based works, legally binding specialists and the sub-impermanent laborers who will take up the constructional works and the upkeep supervisors who are set up for watching.

References

Ahn, K.Y. and Kang, K.S., 2015. Research on construction safety assessment topic areas-Focusing on domestic construction site. Journal of the Korea Safety Management and Science, 17(4), pp.1-12.

Ahn, S., Park, Y.J., Park, T.H. and Kim, T.H., 2015. Development of Safety Training Delivery Method Using 3D Simulation Technology for Construction Worker. Journal of the Korea Institute of Building Construction, 15(6), pp.621-629.

Ameyaw, E.E., Hu, Y., Shan, M., Chan, A.P. and Le, Y., 2016. Application of Delphi method in construction engineering and management research: a quantitative perspective. Journal of Civil Engineering and Management, 22(8), pp.991-1000.

Arslan, M., Cruz, C., Roxin, A.M. and Ginhac, D., 2017, October. Using Spatio-temporal Trajectories to Monitor Construction Sites for Safety Management. In Proceedings of the 9th International Conference on Information Management and Engineering (pp. 211-216). ACM.

Bates, T., Mahoney, A., O’Brien, M., Sewing, S.A. and Zwinggi, K., 2017, January. Construction SH&E Best Practices: Guidance for Young Professionals. In ASSE Professional Development Conference and Exposition. American Society of Safety Engineers.

Chan, I.Y.S., Liu, A.M.M. and Chen, B., 2018. Management Strategies for 5D-BIM Adoption in Hong Kong. In Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate (pp. 1023-1039). Springer, Singapore.

Chan, Y.S.I., Leung, H.Y., Fung, W.H.I. and Leung, M., 2016. How can BIM support construction safety management? Development of SIM. In MATEC Web of Conferences.

Chen, X. and Lu, W., 2017. Identifying factors influencing demolition waste generation in Hong Kong. Journal of cleaner production, 141, pp.799-811.

Cheung, W.F., Lin, T.H. and Lin, Y.C., 2018. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies. Sensors, 18(2), p.436.

Chiang, Y.H., Tao, L. and Wong, F.K., 2015. Causal relationship between construction activities, employment and GDP: The case of Hong Kong. Habitat international, 46, pp.1-12.

Dale, A.M. and Evanoff, B., 2017. 0166 Mismatch between surveillance of risks and recorded injuries in construction: integration of ergonomics into a comprehensive safety program. Occupational and Environmental Medicine, 74, p.A50.

Ding, L., Zhang, L., Wu, X., Skibniewski, M.J. and Qunzhou, Y., 2014. Safety management in tunnel construction: Case study of Wuhan metro construction in China. Safety science, 62, pp.8-15.

Dong, Y.H. and Ng, S.T., 2015. A social life cycle assessment model for building construction in Hong Kong. The International Journal of Life Cycle Assessment, 20(8), pp.1166-1180.

Fellows, R.F. and Liu, A.M., 2015. Research methods for construction. John Wiley & Sons.

Fung, A., Ho, J.H., Yim, S. and Chiu, P.K., 2017, December. Noise Reduction by Improving Building Envelopes-The Hong Kong Housing Authority Experience 2017. In INTER-NOISE and NOISE-CON Congress and Conference Proceedings (Vol. 255, No. 4, pp. 3078-3089). Institute of Noise Control Engineering.

Guo, B.H., Yiu, T.W. and González, V.A., 2016. Predicting safety behavior in the construction industry: Development and test of an integrative model. Safety science, 84, pp.1-11.

Hardin, B. and McCool, D., 2015. BIM and construction management: proven tools, methods, and workflows. John Wiley & Sons.

Haseeb, M., Lu, X. and Bibi, A., 2014. Construction Safety Management Related Dominant Issues in the Construction Sector of Pakistan. In Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate (pp. 787-797). Springer, Berlin, Heidelberg.

Hollnagel, E., 2014. Safety-I and safety–II: the past and future of safety management. Ashgate Publishing, Ltd..

Hong, J., Shen, G.Q., Feng, Y., Lau, W.S.T. and Mao, C., 2015. Greenhouse gas emissions during the construction phase of a building: a case study in China. Journal of Cleaner Production, 103, pp.249-259.

Hong, T., Koo, C., Kim, J., Lee, M. and Jeong, K., 2015. A review on sustainable construction management strategies for monitoring, diagnosing, and retrofitting the building’s dynamic energy performance: Focused on the operation and maintenance phase. Applied Energy, 155, pp.671-707.

Ju, C. and Rowlinson, S., 2014. Institutional determinants of construction safety management strategies of contractors in Hong Kong. Construction management and economics, 32(7-8), pp.725-736.

Lau, W.K., Ho, D.C.W. and Yau, Y., 2016. Assessing the disability inclusiveness of university buildings in Hong Kong. International Journal of Strategic Property Management, 20(2), pp.184-197.

Li, H., Chan, G., Huang, T., Skitmore, M., Tao, T.Y., Luo, E., Chung, J., Chan, X.S. and Li, Y.F., 2015. Chirp-spread-spectrum-based real time location system for construction safety management: A case study. Automation in Construction, 55, pp.58-65.

Li, H., Lu, M., Hsu, S.C., Gray, M. and Huang, T., 2015. Proactive behavior-based safety management for construction safety improvement. Safety science, 75, pp.107-117.

Li, R.Y.M., Fong, S. and Chan, H.M., 2015. Scholars’ Comments and Criticisms on Construction and Municipal Solid Waste Management in Hong Kong and Singapore from 2000 to Present: A Review of Digital Information Online. In Construction Safety and Waste Management (pp. 31-45). Springer, Cham.

Li, Z., Shen, G.Q. and Xue, X., 2014. Critical review of the research on the management of prefabricated construction. Habitat international, 43, pp.240-249.

Li, Z., Shen, G.Q. and Xue, X., 2014. Critical review of the research on the management of prefabricated construction. Habitat international, 43, pp.240-249.

Mäki, T. and Kerosuo, H., 2015. Site managers’ daily work and the uses of building information modelling in construction site management. Construction management and economics, 33(3), pp.163-175.

Mok, K.Y., Shen, G.Q. and Yang, J., 2015. Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), pp.446-457.

Park, J., Park, S. and Oh, T., 2015. The development of a web-based construction safety management information system to improve risk assessment. KSCE Journal of Civil Engineering, 19(3), pp.528-537.

Seo, J., Han, S., Lee, S. and Kim, H., 2015. Computer vision techniques for construction safety and health monitoring. Advanced Engineering Informatics, 29(2), pp.239-251.

Sousa, V., Almeida, N.M. and Dias, L.A., 2014. Risk-based management of occupational safety and health in the construction industry–Part 1: Background knowledge. Safety Science, 66, pp.75-86.

Sunindijo, R.Y., Zou, P.X. and Dainty, A., 2017. Managerial Skills for Managing Construction Safety. Civil Engineering Dimension, 19(2), pp.63-72.