Identification Of Risk And Approaches For Managing Disputes In A Desalination Plant Construction Project

Pre construction risk

Prepare a report that includes the following information: 

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

1.Identify 2 inherent risks each in the pre-construction, construction and operational phase of the project and discuss the possible consequences for the client and/or contractor. There should be a total of 6 risks in this section. 

2.For each risk, discuss which party to the contract is best able to control this risk. 
3.Identify and discuss two Dispute Resolution approaches suitable for the case study project. 

4.Discuss how you would manage the contract to reduce the occurrence and impact of disputes on the project. 

The Victorian Desalination Plant project was started to remove soluble salt from ocean and sea water. It was designed to make sea water suitable for drinking, irrigation and industrial purposes. The project aimed to provide safe and reliable water supply to growing communities. The requirement for desalination plant Victoria arose due to population growth, climate and drought. It will help in supply of high quality drinking water even if there is not enough rain (Water-technology, 2018).

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

It is the largest desalination plant in Australia. It has been constructed on the Bass Coast in Wonthaggi. Apart from the plant, on the acquired land a buffer zone was also built. An ecological reserve was also constructed around the plant. Its production capacity is about one third of Melbourne’s annual water requirements. It is completely independent of rainfall (Aquasure, 2018).

Flora and Fauna of conservation concern

The desalinations plants have the potential to affect the marine environment negatively. The plant will lead in depletion and disruption of groundwater that will impact negatively on native flora, fauna and surface water. It will also affect ecosystem negatively because of dewatering of excavation areas. The construction across water ways will damage or create disturbance of surface water ecosystems. Waterways will be negatively affected by construction, verification and cleaning activities (Lenntech, 2018).

In the project area there are eleven different ecological vegetation classes are present. In damp depressions indigenous species like White Purslane and Buttercup have been found. Pastoral land and road reserve, dunes in foreshore reserve and freshwater habitat are three types of fauna habitat found within plant side and foreshore.

Marine life of the plant area would be highly affected by the saline brine and other by products emitted by desalination. Local seafloor habitat would also have impact construction and outfall structures (National Oceanic and Atmospheric Administration , 2018).

Exploitation of marine resources is a large issue. Ocean Dumping Act, Marine mammal protection act are related to the marine structure. The legal risk associated with flora and fauna involves destruction of laws that protect our oceans and marine structure. The laws are made for the safeguard of native vegetation, removal of fauna habitat, increase in traffic and noise impacting fauna, sediment discharge to waterways will lead to soil erosion and will impact surface water ecosystems and seawater intrusion will affect native terrestrial negatively (Aquasure, 2018). 

Flora and Fauna of conservation concern

Impact on geology, geomorphology and soils

The geology of the state includes a number of sedimentary basins separated by bedrock highs. The south and west Gippsland regions consist of a number of faults and basins. The rock cliffs of the region are covered with sandy clay. The surface of soil is of dark grey sand. The soil and sediments contain oxidisable sulphides.

The violation of Catchment and Land protection Act is the major issue with the project. The law deals with the causes of degradation of land, soil conservation and protection of water sources.

The various risk associated are causing vibration leading to disturbing the dune system, damaging historical heritage  items, ground movement and subsidence may affect public safety and  may contaminate soil that may lead to affect human health. (State of Victoria, 2017)

Noise and vibration

In the area, twelve residences are found as more sensitive to noise and vibration. Victoria has strict laws to protect residents from level of noise in their resident area. State Environment Protection Policy (control of noise from commerce, industry and trade) is the threat for the noise created by the plant. This law aims to protect people from the negative effects of noise in their residential and public areas.

The various risk associated with noise and vibration includes impact on sensitive receptors and creating disturbance for flora and fauna. Certain type of construction machinery creates noise and vibration in the environment. The various noise producing sources includes crane, bulldozer, excavator, back hoe, compactor, road truck, compressor, concrete saw, paver and diesel generator etc. (State Government of Victoria, 2018)

Traffic

A number of roads were used as access routes to the site. The construction of the plant may generate heavy vehicle because of delivery of pipes and removal of spoil. The traffic volumes as increased due to construction activities of the plant.

The traffic volume information was collected that states that Lower Powlett road as 283 vehicles per day. Transport infrastructure risk associated with construction of desalination include reduction in access across the roads that lead to affect the emergency response, it will increase the number of vehicles on road that may increase the road traffic congestion and construction activities of the plant will lead to limited or restricted road access.

There are strict requirements on the transport. The transport vehicles should have permit issued by the EPA. The load is decided by the government for a site and the legislation uses a tracking system to maintain road safety.

Impact on geology, geomorphology and soils

During the construction the trucks, machinery and other heavy vehicles will continuously access the site increasing the volume of vehicles on road. And the construction activities of the plant, across the roads may also require the closure of the road due to high impact on public access to roads surrounding the site. Some other issues found with construction traffic included impact on farming operations and noise and dust (Australian Government, 2017).

Air quality

The local air quality of the area would be strongly influenced by the air quality of the site. The risks associated include generation of dust impacting on the visual amenity and causing various health problems. There is a large emission of green house gases from the plant from each component of project used in power supply.

During the operation phase of the desalination plant a variety pollutants causing air pollution was resulted from trucks used to transfer water that causes the emission of carbon monoxide and carbon di oxide and the unpaved roads also produced a large quantity of dust.

Air quality objectives and goals are set by the SEPP (Ambient Air Quality) for whole Victoria. The law deals with monitoring and reporting majorly six common pollutants including carbon monoxide, nitrogen di oxide, photochemical oxidents, sulphur di oxide and lead. The emission of such pollutants is a threat for the operations of plant.

The increasing pollution created a threat to health worldwide; the spread of disease was increased due to air pollution. The air pollution resulted to harm public health, social welfare and the environment. The use of high gas emitting machineries was prohibited; the use of machineries and vehicles should comply with the provision of law (Victoria Law Foundation, 2018). 

Solid and liquid waste management

Waste management policies were introduced in Environment protection act, 1970. This law deals with the management of industrial waste. Various policies are formulated to cover full waste cycle. It provides the industries with the guidelines to establish the technologies to control the waste management in their organization.

Plant operation process will generate waste like seawater screening, membrane cleaning waste, lime sludge, pre treatment back wash sludge and discarded equipments wastes. Some waste will be generated continuously from operation and maintenance of the plant, office, workshops, chemical shops, laboratories and gardening.

The issue of spread of various diseases like potato Cyst Nematode was raised due to spoil waste from transfer pipelines. The cleaning and preservation chemicals include causing soda, hydrochloric acid, biocides, detergents, citric acid and ammonia. Discharge of barine into sea may lead to negatively affect the marine life of the site. It would have become threat to flora fauna. High salt concentration and waste chemicals will create danger for the marine life spreading various kinds of diseases (EPA , 2018).

Construction Risk

Risk Related to flora and fauna conservation

Habitat assessment should be done to determine the conservation significance of the vegetation. The application of net gain approach should be done collaborating with Victorian native vegetation management that will create satisfaction to the environment and sustainability department.

Risk related to geology and soils

Performance requirement framework for management of geology and soil should be implemented. EPS’s guidelines to minimize the risk of soil erosion and sediment loss should be implemented.

Risk related to noise and vibration

The management should work on reducing noise nuisance from vehicles, machineries and construction activities. The proceedings should adhere with the guidelines of clause 12 of construction and demolition site noise laws.

Risk related to transport

The management should consider sensitive routes past schools, hospitals, age care facilities and churches. Traffic management plans should be audited on site. Maintain a public access path around the site and should utilize temporary traffic signage. 

Risk Related to air quality

The policies to maintain air quality during operations should be implemented consistent with State Environment Protection Policy. The odour and gas emissions from the plant should be reduced.

The disposal of waste should comply with the waste management policies established by Environment Protection Act. The activities should be in accordance with Industrial Waste Management Policy and dust mitigation measures should be used (Zafar, 2014).

Below are the two dispute resolutions approaches can be used on the site:

Negotiation

Negotiation is the most common method of setting differences between the parties. It can be defined as the back and forth communication between the parties about the conflict with an aim to find the solution.

The party can directly negotiate with the other party or may hire other person to negotiate with other party on your behalf. It allows the party with the benefit of participating directly affecting the growth of the business. The agreement of negotiation can be used as contract and is enforceable. The process of negotiation can be used at any stage of conflict. It can be used as first method of problem solving and could reach at a mutually acceptable agreement.

The characteristics of negotiation are following:

  • Voluntary
  • Confidential and private
  • Informal
  • Unstructured
  • Process is control by the parties
  • Agreement is enforceable
  • Lead to win win solution. (Shmueli, 2005)

Mediation

It is a voluntary process where impartial person is appointed who communicates and promotes reconciliation between the parties.  It is generally used if negotiation is unsuccessful. The mediator controls the process of dispute resolution. The mediator does not make any decision but helps in negotiation only. The parties directly involved in decision making for their agreement. 

The mediator may sometimes personally meet with both the parties to collect the valuable information. Meetings are held at agreed locations.

Below are the characteristics of Mediation

  • Smooth communication and corporation
  • Provides opportunity to solve disputes on your own
  • Provides the facility to reach at mutually acceptable decisions.
  • Avoid the chances of uncertainty
  • Preserve ongoing relationships (Okbar, 2018).

To control and resolve rose in the site among the employees or with the outside people. The company should appoint a Dispute Resolution Board. The board will consist of experienced members. The board will be responsible for meeting with other party for the resolution of any conflict. The members will first negotiate with the party to resolve the dispute and if unsuccessful the mediation process would be used (FERC, 2018).

Conclusion

Overall, it can be said that the risk associated with VDP are controllable if proper measures are taken. There is need for proactive measures to ensure successful completion of VDP. The failure to do so may not only lead to failure of the project, but also impact stakeholders negatively. 

References

Aquasure (2018) The Victorian Desalination Project [online]. Available from: https://www.aquasure.com.au/ [Accessed 07 May 2018]

Aquasure (2018) Victorian Desalination Project [online]. Available from: https://www.aquasure.com.au/uploads/files/D&C%20PGA%20EMP%20Att%20I3%20-%20PGA%20Site%20Rehab.pdf [Accessed 07 May 2018]

Australian Government (2017) Environmental legislation licences and permits [online]. Available from: https://www.business.gov.au/info/run/environmental-management/environmental-legislation-licences-and-permits [Accessed 07 May 2018]

EPA (2018) Construction and demolition waste legislationx` [online]. Available from: https://www.epa.vic.gov.au/your-environment/waste/construction-and-demolition-waste/construction-and-demolition-waste-legislation [Accessed 07 May 2018]

FERC (2018) Common Dispute Resolution Approaches [online]. Available from: https://www.ferc.gov/legal/adr/continuum/com-dra.asp [Accessed 07 May 2018]

Lenntech (2018) Key issues in Seawater Desalination [online]. Available from: https://www.lenntech.com/processes/desalination/general/desalination-key-issue.htm [Accessed 07 May 2018]

National Oceanic and Atmospheric Administration (2018) Resource Issues: Desalination [online]. Available from: https://montereybay.noaa.gov/resourcepro/resmanissues/desalination.html.

Okbar (2018) Methods for Resolving Conflicts and Disputes [online]. Available from: https://www.okbar.org/public/Brochures/methodsForResolvingConflictsAndDisputes.aspx [Accessed 07 May 2018]

Shmueli, D.F. (2005) Approaches to Conflict Reoslution [online]. Available from: https://www.eolss.net/sample-chapters/C14/E1-40-03.pdf [Accessed 07 May 2018]

State Government of Victoria (2018) Environmental effects Desalination Project [online]. Available from: https://www.water.vic.gov.au/__data/assets/pdf_file/0012/54102/EES-Volume-3-Desal-plant.pdf [Accessed 07 May 2018]

State of Victoria (2017) Soil management [online]. Available from: https://agriculture.vic.gov.au/agriculture/farm-management/business-management/legal-information-for-victorian-landholders/soil-management [Accessed 07 May 2018]

Victoria Law Foundation (2018) Nuisance laws, including pollution [online]. Available from: www.victorialawfoundation.org.au/nuisance-laws-including-pollution [Accessed 07 May 2018]

Water-technology (2018) Wonthaggi Desalination Plant, Victoria [online]. Available from: https://www.water-technology.net/projects/wonthaggidesalinatio/ [Accessed 07 May 2018]

Zafar, S. (2014) Desalination Outlook for MENA [online]. Available from: https://www.ecomena.org/desalination-outlook-mena/ [Accessed 07 May 2018]